Picking a Number Means Your Forecast Is Wrong.
The reason why I think probabilistic forecasting is the future of planning is because it shifts the conversation from what the number is to what the scenarios are. Given the increase in volatility across regulations, markets and climate, the point forecast is no longer the right method for planning in supply chain.

A probabilistic forecast gives the range of what a number could be and how likely each outcome is, instead of one number. It shows the full range of possibilities which enables scenario planning, planning resilience and ultimately a better grasp on your supply chain. A useful example comes out of 1874, when Francis Galton showed off the Galton board.1 Each individual ball has a probability of landing in a different spot, but together all the balls follow a normal distribution on an ordinary day. On a sale day or a slow flavour, the pile takes a different shape. This is what your demand forecast is.
Try it
Let’s imagine you run a lemonade stand. Some days the weather is great, some days you might have a 3 for 1 sale, some days your competitor is selling half price. Each scenario has its own range of possibilities for the number of lemonades you will sell. Pick a day on the board and drop a hundred of them. The shaded pile is the forecast and the bars are what actually happened.
Each ball is one day at the lemonade stand. On days that lean, a stick on each pin shows which way it pushes the ball; pins without a stick are fair. Demand here moves in steps of 30, so usually fewer than one day in ten lands below Low, and fewer than one in ten above High. The scenarios and numbers are invented to show how the board behaves.
A good forecast is wrong three days in four
Probabilistic forecasting is the breakdown of all possible outcomes and the chance of each outcome happening.
That sounds abstract until you look at the middle of the pile. On an ordinary day the most likely number of lemonades you sell is 520, and it only happens 23% of the time. So a forecast of 520 misses on more than three days in four, and it is still a good forecast. The miss isn’t the forecaster’s fault. It’s the shape of the board.
You can’t remove the miss, but you can know what the distribution of the miss will be. As a demand planner it is your job to make the miss as small as possible and make sure that the plan is in place to be able to cover most of the scenarios thrown at you.
The best plan is often not the forecast
Your supply management is static today because the demand forecast is a point forecast, and companies are focusing on what the number is instead of trying to understand what the different options are.
Here is what that costs at the lemonade stand. Take fresh-squeezed lemonade, poured away at the end of the day. Every lemonade you’re short loses $1.00 of margin, and every one left over costs $2.50 in lemons and work. With those costs the cheapest plan is 490 a day, below the forecast. Making the forecast instead costs $71 a day in waste and lost margin, against $60. Bottled lemonade is the opposite case. A leftover bottle can be sold tomorrow for about four cents of storage, so the cheapest plan is 610, and making the forecast costs five times more than it should.
The rule behind both is old.2 Plan at the percentile you get when you divide the cost of a unit short by the cost of a unit short plus the cost of a unit left over. Each decision at the stand lands on its own point of the same pile. You budget your takings on the average, because averages add up across flavours and weeks. You buy lemons firm for the middle and keep a neighbour’s shop as a backup for great-weather days. You ask a friend to help on the busiest days, not every day. In a food business those are finance, procurement and capacity, and they work the same way.3
The one-number habit shows up in safety stock too. The usual formula rebuilds a bell curve from one number, which works badly on sale days, for slow flavours and for anything fresh.4 A slow flavour that sells 1.6 lemonades on an average day, but none at all on most days, needs 5 ready to be covered nine days in ten. And on the days you sell out by noon, your notebook only records what you had, so your best flavour looks smaller than it is and gets planned too low again.5
Your system takes one number. Give it the right one.
Without new software, I would implore planners to take their high/base/low forecasts and calibrate the range. First decide what your high and low are meant to mean, for example one day in ten above the high and one below the low. Then count how often that really happens. If it’s much more often, the range is too narrow. If it almost never happens, it’s too wide and you’re buying lemons you don’t need.6
Then use the fields your system already has. The forecast field gets the average, so totals and finance keep working. The safety stock field gets the gap between your percentile and the average. For bottled lemonade that’s 610 − 520, a buffer of 90 bottles on top of the daily forecast, recomputed every week so the days with a 3 for 1 sale get a bigger one. Low, base and high go into three forecast versions for S&OP. Fresh lines that should plan below the average, like the fresh-squeezed lemonade, are the one exception. Most systems won’t take a negative safety stock, so set those quantities directly in the schedule.
To see the pile for a product like yours, and the numbers you would put into your current system, book a demo.
Frequently asked questions
What is probabilistic forecasting?
Forecasting the full range of possible outcomes and how likely each one is, instead of a single number. It is usually published as percentiles, such as the 10th, 50th and 90th, or as a prediction interval.
Which percentile should I plan production to?
Divide the cost of a unit short by the cost of a unit short plus the cost of a unit left over. For fresh-squeezed lemonade that is poured away at night, the answer can be below the median. For bottled lemonade that keeps, it is often the 90th percentile or higher.
Do I need a new planning system to use it?
No. Put the average in the forecast field, the gap between your percentile and the average in the safety stock field, and Low, Base and High in three forecast versions.
The lemonade stand, its days, demand figures and costs are invented to show how the methods behave. Percentages are calculated exactly from the boards described. Photo: John Cardamone on Unsplash.
Footnotes
-
Galton described the board in Natural Inheritance (1889). Strictly, the pile is binomial, which looks normal once there are enough rows of pins (Galton board). ↩
-
Operations research calls it the newsvendor model (Arrow, Harris and Marschak, 1951). On point-of-sale data from a large German bakery chain, ordering from machine learning and quantile regression forecasts beat traditional methods once there was enough history, and better forecasting was the biggest source of the gain (Huber, Müller, Fleischmann and Stuckenschmidt, 2019). ↩
-
No study assigns a percentile to each team. It follows from applying the same rule to each team’s own costs and planning horizon. Functions can keep different goals and still plan together when the process gives them a shared basis (Oliva and Watson, 2011). ↩
-
This is called censored demand (Sachs and Minner, 2014). Log stockout days and treat them as “at least this much”. ↩
-
Forecasters call this calibration. The other half is sharpness: between two honest ranges, the narrower one is better (Gneiting, Balabdaoui and Raftery, 2007). Where a single number is scored with MAPE, a range is scored this way. ↩